tudor grange leisure centre


The existing 1970’s leisure centre was at the end of it’s life and required replacement. This new facility has a 25 metre competition swimming pool, learner pool, and adjustable depth diving pool, together with a sports hall, fitness suite, exercise studio and café. The consortium of Parkwood Projects, Burke Rickhards Ltd and Leadbitter building contractor gained a “Built in Quality” award from the LABC Midlands Region for this development which also links to an existing indoor tennis centre. The southern side of the building in particular has been designed to respond to the parkland setting.

Client: Solihull Metropolitan Borough Council
Contract Value: £12 Million
Completion Date: April 2008